Partially tiled wall with white tiles meeting an exposed, weathered and stained surface during renovation.

Reference photo: new tiles meeting the surface they sit on.

Home / Services / Bathroom Renovations

02 — BATHROOMS

Bathroom Renovations

I do bathroom wall and floor tiling and related renovation work in Bentleigh and the surrounding suburbs. Every job is planned around what is already in the room: the walls, the floor and what turns up once the old tiles come off.

LAYER 01 — THE WORK

What a bathroom job with me covers

Most bathroom work I do centres on tiling, along with the work that has to come before it:

  • Wall tiling, whether it’s the shower, behind the vanity or full-height walls.
  • Floor tiling, laid to suit the room’s layout and how it drains.
  • Surface preparation, so walls and floors are ready before any adhesive goes on.
  • Related finishing work, such as plasterboard and plastering or painting where the bathroom needs it.

You deal with me directly from the first on-site assessment to completion. If you would like more detail on the tiling itself, my wall and floor tiling page explains how I approach different surfaces.

THE WET-AREA SEQUENCE

How a bathroom comes together

A bathroom is a wet room, so the order of the work matters. Each stage has to be ready before the next one starts. This is the usual sequence, and who does each part.

01 · WHO: ME
The old tiles come off. Existing tiles and finishes are removed. This is often when concealed conditions show up. If something does, I’ll show you and talk through the options before going further.

02 · WHO: APPROPRIATELY LICENSED SPECIALISTS
Plumbing, electrical and any licensed waterproofing. These parts are completed by appropriately licensed specialists, not by me. I plan my preparation and tiling around their work.

03 · WHO: ME
Surface preparation. The walls and floor are checked and prepared so they’re ready before any adhesive goes on.

04 · WHO: ME
Wall and floor tiling. The shower, walls and floor are tiled to the layout we agreed, with the floor laid to suit how the room drains.

05 · WHO: ME
Finishing work. Grout, edges and corners, plus any plasterboard, plastering or painting we agreed for the room.

LAYER 02 — WHO DOES WHAT

Clear roles in one room

My part

The on-site assessment, surface preparation, wall and floor tiling, and the related finishing work we agree on. I organise my work carefully, check it as I go and raise any concerns with you directly.

Licensed specialists

Plumbing, electrical work and any waterproofing that requires a licensed trade are completed by appropriately licensed specialists. How that fits into your renovation.

Your part

Choosing materials and setting your priorities for the room. I’ll explain the options and any likely difficulties honestly, without promising what I can’t deliver.

LAYER 03 — COST & TIME

Why every bathroom is priced on its own

The cost of a bathroom renovation, how long it takes and what work it involves all depend on the existing property, the materials you choose and the scope we agree. Any pricing you see before a detailed written quotation is general guidance only.

Some conditions stay hidden until the old finishes are removed. If something turns up, I’ll show you, explain the practical solutions and discuss them before carrying on.

What affects the cost of a bathroom renovation →
What can appear when old tiles come off →
Quotation & work terms →

A worker wearing an orange hard hat kneels indoors, spreading mortar across a floor beside a bucket, with tile spacers scattered across the partially tiled area.

Reference photo: kneeling to spread mortar and lay large floor tiles.

LAYER 04 — FIRST STEPS

Starting your bathroom

Approximately 15 years of residential renovation experience, working in Melbourne since 2019.

1 — Tell me about the bathroom: your suburb and the work you have in mind. Photos help. The form doesn’t take attachments, so email them to [email protected] or mention in your message that you have some and I’ll ask for them.

2 — A free on-site assessment, so I can look at the walls, the floor and the existing conditions in person.

3 — A detailed written quotation that sets out the scope, so you know what is included before any work begins. See how I work →