Home  /  Quotation & Work Terms

TERMS — IN PLAIN ENGLISH

Quotation & Work Terms

Tiling Bentleigh is the independent tiling and renovation service of Ivan Bodnar, a home renovation specialist in Melbourne, Victoria. These terms explain in plain English how quotations, arranging work and the work itself are handled, so you know what to expect before anything starts.

01 — QUOTATIONS

Quotations and pricing

Nothing is sold or booked on this website

The website is for information and enquiries only. Sending an enquiry doesn’t create a booking, an agreement or any obligation for either of us. It just starts a conversation about your project.

Free on-site assessment and quote

The on-site assessment and the quote are free. Where a job suits what I do, I look at the space in person before preparing a detailed written quotation, because existing conditions affect what the work involves. Times for an assessment are arranged directly with me by phone or email.

Pricing is general guidance unless it's in writing

Any figure mentioned on this website, over the phone or during a conversation is general guidance only. The pricing that applies to your job is the pricing in a specific written quotation. That quotation is based on the scope we agree and the materials you select. If either changes, the price may change too.

You can read more about how this works on the on-site assessment and written quotation page.

02 — EXISTING CONDITIONS

Concealed conditions and timeframes

An assessment shows a lot, but not everything. Some conditions behind walls and under floors only become apparent once existing tiles and finishes are removed. When that happens, the scope of work may need to change.

If I find something that affects the job, I’ll explain what I’ve found and talk the practical options through with you directly before going further. Any change to scope or price is discussed with you first rather than added quietly at the end.

Timeframes work the same way. How long a job takes depends on the existing property, the materials selected and the agreed scope, so I don’t give fixed completion dates on this website.

I explain the options and any possible difficulties as they come up, without promising what I can’t deliver.

03 — LICENSED WORK

Plumbing and electrical

I don’t personally carry out licensed plumbing or electrical work. Where a job includes those components, appropriately licensed specialists complete them. How that fits into your renovation →

SCOPE OF SERVICES

What is and isn't offered

My work centres on residential wall and floor tiling, surface preparation and practical home improvements. Architectural design, engineering and whole-house construction are not offered. See the full list of services.

AVAILABILITY

Hours and urgent requests

Stated hours are 9am to 5pm, Monday to Sunday. I don’t provide a 24/7 emergency service. Urgent or weekend work may be possible depending on existing commitments, but it is never guaranteed.

04 — IN WRITING

What is confirmed in writing

This page doesn’t set out warranty terms or compliance statements, and none are claimed here. Any that apply to a particular job should be confirmed in writing for that job and checked against current Victorian requirements.

The details of your job, including what’s included, the materials, the price and how changes are handled, belong in your detailed written quotation. Where that quotation and this general page differ, the specific written quotation is the one to rely on.

For how enquiry information is handled, see the Privacy Policy.

Before you go ahead, check that:

— your quotation is in writing and lists the agreed scope

— you know which parts licensed specialists will complete

— you understand that concealed conditions can change the scope

— any questions are answered. The FAQ covers the common ones.

Questions about these terms or your own project? Discuss Your Project →