CHAPTER 03 — KITCHENS

Kitchen tiling that starts with the wall behind it.

I tile kitchen floors and splashbacks and carry out practical kitchen improvements in Bentleigh and surrounding Melbourne suburbs. You deal with me directly, from the on-site assessment through to completion.

LAYER 01 — SCOPE

What the work covers

Splashbacks

Wall tiling between benchtop and cabinets, set out around windows, benchtop edges and outlets so cut tiles sit where they look considered.

Kitchen floor tiling

Floor tiles laid over a surface that has been checked and prepared first. More on floors on the Flooring page.

Practical improvements

Related finishing where the kitchen needs it, including plasterboard and plastering and painting.

Several plastering or tiling trowels rest across a bright green materials bucket, with white compound visible and a tiled wall behind.

Reference photo: preparation materials before tiling begins.

LAYER 02 — EXISTING CONDITIONS

How your walls and floors shape the job

Is the splashback wall ready for tile?
Old splashback tiles, patched plaster and uneven sheeting all affect how new tiles sit. I look at the wall first, then explain whether it needs repair, new sheeting or simply careful preparation.

What is the floor sitting on?
Kitchen floors often run under cabinets and into neighbouring rooms. Flatness, the condition of the existing floor and how it meets adjoining spaces all change the approach.

What if something turns up?
Some conditions only become apparent once existing finishes are removed. If that happens, I show you what I’ve found and talk through the options before carrying on. What can appear when old tiles come off

“A splashback can only be as straight as the wall behind it. Old tile adhesive, patched plaster or uneven sheeting will show along every grout line once the new tiles are up.” Why preparation matters

LAYER 03 — WHO DOES WHAT

Plumbing and electrical, by the right trade

Kitchens often involve a sink, tapware, a dishwasher connection or power points in the splashback. Those components are completed by appropriately licensed specialists, and I plan the tiling around their work so each stage follows in a sensible order.

My part is the tiling, the surface preparation and the practical finishing around it. I work to the cabinetry and layout you have chosen, and I point out anything in the existing conditions that could affect how it comes together.

LAYER 04 — SEQUENCE

What happens in what order

First, plumbing and electrical.
Any work on the sink, tapware, dishwasher connection or splashback power points is completed by appropriately licensed specialists before the walls are closed up and tiled.

Then, sheeting and preparation.
Wall sheeting is repaired or replaced where needed, and the walls and floor are prepared so the tile has a sound, even surface to sit on.

Then, splashback and floor tiling.
Tiles are set out around the benchtop, windows and outlets, laid, grouted and checked as the work goes.