Home / Project Work
PROJECT WORK
This page covers the residential work I take on in Bentleigh and surrounding Melbourne suburbs, from wall and floor tiling to the plastering and painting around it. Every project starts with the existing conditions, and that is also how documented project examples will be set out here once they are confirmed.
Reference photo: large floor tiles going down over spread adhesive, with levelling clips along the joints.
SCOPE AT A GLANCE
Seven types of work, all for homeowners and clients in Bentleigh and the wider Melbourne metropolitan area. You deal directly with me from the on-site assessment to completion.
TILING
Most of my work is wall and floor tile installation: bathroom walls and floors, kitchen floors and splashbacks, and laundries. What you see at the end is the tile, the pattern and the grout line. What decides how long it lasts is the surface underneath, so how flat, sound and dry the existing surface is comes first.
On every project, I check the wall or floor before any tiling starts. If it needs work first, that work goes into the scope.
Reference photo: a levelling clip pressed between large floor tiles at the joint.
ROOMS
Wet and working rooms where tiles take the most wear. Appropriately licensed specialists complete any plumbing and electrical components.
02 — BATHROOMS
Wall and floor tiling plus related renovation work. Costs and timeframes depend on the existing property, the materials you choose and the agreed scope.
03 — KITCHENS
Kitchen floor tiling, splashbacks and practical improvements, starting with the wall or floor the new tiles will sit on.
04 — LAUNDRIES
Laundry tiling and practical updates for a small room that deals with water, heavy appliances and daily use.
SURFACES
The work around the tiles: what goes on the floor, what the wall is made of and the last coat that finishes a room.
05 — FLOORING
Residential flooring, planned around the subfloor. Before anything new goes down, I look at how flat and sound the existing surface is.
06 — PLASTERING
Plasterboard and plastering as part of home renovations, often the step that gets a wall ready for tiling or painting.
07 — PAINTING
Painting inside and out, either as a practical home improvement on its own or to finish rooms after other renovation work.
PROJECT EXAMPLES
Documented project examples and photographs will be added to this page as they are confirmed. Each one will follow the same order as the work itself, so you can see more than the finished tiles.
A Existing conditions
What the room was like before work started, and what was found once the old finishes came off. Some concealed conditions only become apparent at that stage. What can appear when old tiles come off →
B Preparation
How the surface was made ready, and where appropriately licensed specialists were involved. How plumbing and electrical work fits in →
C The finish
The tile, layout and grout that ended up on the wall or floor, with the agreed scope it was built to.
Your own project will be different, so the most useful next step is a free on-site assessment of your space, followed by a detailed written quotation. Discuss Your Project →